Fewer home buyers are getting a LIM or legal advice
Fewer home buyers are doing their homework before they buy, according to new research for the Real Estate Authority (REA). This year, just 33% of buyers got a land information memorandum (LIM) before buying, down from 37% last year, and 49% used a lawyer or conveyancer, down from 59%.
Title searches fell to 28%, from 34% a year earlier and the lowest in the six years of the survey. Only 26% looked at the council’s property file, down from 33%.
Building inspection reports held steady. Some 43% of buyers got a report from a certified inspector, much the same as last year’s 44%.
Why it matters
“Buying a home is often the most financially significant purchase a consumer will ever make. Obtaining key property information documents is fundamental due diligence that a responsible buyer should always undertake,” REA Chief Executive Belinda Moffat said.
“While legal fees will be a consideration, the downstream costs that may be incurred if an important issue with a property is not identified before making an offer can be very high,” Belinda said.
She urged buyers not to rush. “It can be easy to fall in love with a home at first sight and want to act quickly to secure a bargain or to save costs or time by avoiding professional advice,” she said.
The survey, by NielsenIQ, covered 744 people who had bought, sold or made or received an offer on a property through a licensed agent in the past year. Among buyers who didn’t get a certified building inspection, 23% said they trusted the one provided by the seller, and 18% said it was too expensive.
What a LIM tells you
A LIM is a council report on a property. Under the Local Government Official Information and Meetings Act 1987, councils must issue one within 10 working days of an application, and they can’t refuse.
It must include information on natural hazards, the likely presence of hazardous contaminants, stormwater and sewerage drains, the water supply, rates owing, consents and notices, and permitted land use. Since January it must also include information on granny flats built without a consent under the new exemption.
A LIM has limits. The REA’s Settled website says “if the council hasn’t been notified of a weathertightness issue with the property, it won’t show on the LIM”, and it doesn’t include building plans submitted for consent. The council property file may hold more, including site plans and original house plans.
Fees vary by council. Waimakariri District Council, for example, charges $263 for an electronic LIM.
Your checklist
Settled recommends a title search by your lawyer or conveyancer, a LIM, the council property file, a registered valuation, and an inspection by an accredited inspector. For a unit title, add the last 12 months of body corporate minutes.
Be wary of relying on a report the seller supplies. “You are not protected because the inspector’s contract is with the seller, not you,” Settled says, and it recommends a report that meets NZS 4306:2005, noting that building inspectors aren’t licensed in New Zealand.
“REA strongly recommends consumers engage a property lawyer or conveyancer early in the home buying process, as they can give advice on technical property documents and highlight important risks and issues,” Belinda said.